Hello
Is there a way to enforce real time factor = 1 in gazebo simulation ? I understand that it must come at expense of large or uneven time step and therefore physical accuracy.
My intention is to transmit the sensor data that is generated in Gazebo to a software that is a "Black-Box" and therefore must receive the data in real time rate.
Thanks.
↧